The Canyon method

80% HAPPENS BEFORE WE ARRIVE ON SITE.

Our modular solar pods are pre-built in our Australian factory in Braemar, NSW, including racking, solar modules, wiring and waterproofing. By the time our team arrives on site, the complex work is already done.

The result is a faster, safer, and more predictable installation than anything built in the field. No weather delays. No quality control issues. A firm programme you can plan around.

Factory build (off-site)

80%

On-site installation

20%

        What happens in the factory
  • Panel mounting and racking

  • Integrated waterproofing

  • Lighting pre-wired

  • Full electrical wiring

  • EV charging enclosures

  • Quality controlled fabrication

2 weeks

average on-site install per 300 kWp deployed

75%

fewer high-risk on-site labour hours

3x

faster than traditional field-built construction

See it happen

A full commercial install from empty car park to powered-up canopy, condensed to about 60 seconds.

From conversation to handover

HOW IT WORKS

1

2

CONVERSATION

Tell us about your site. A 30-minute call is enough to get started, with no lengthy scoping process.

PROPOSAL

Share your site address and we’ll come back with an accurate, site-specific proposal fast.





3

4

5

6

SITE PREP

We coordinate civil works, electrical upgrades and approvals in the background so your site is ready when the canopy arrives.

ON-SITE INSTALL

We stage the install so a portion of the car park stays accessible throughout. Complete in weeks, not months.


7

HANDOVER

Commissioning, documentation and a full walk-through, then you take ownership of a fully operational canopy.

PRODUCTION

Your canopy is manufactured off-site in controlled factory conditions, ready for rapid on-site deployment.

PROCUREMENT

Once you give the green light, we lock in materials and long-lead components so nothing holds up production.


16

Projects across 3 states

3,170 kWp

Total portfolio capacity

20 MWp

Annual NSW factory capacity

~3,200 t

CO avoided per year